Difference between revisions of "User:Sebastian"

From Timelines
Jump to: navigation, search
(To propose)
Line 18: Line 18:
 
** I'm wondering if we can make the geographical location column more specific. It should still start with the country, but the state and city can be included parenthetically, as with the [[timeline of bicycle sharing systems]]✔
 
** I'm wondering if we can make the geographical location column more specific. It should still start with the country, but the state and city can be included parenthetically, as with the [[timeline of bicycle sharing systems]]✔
 
** I think some closure/shutdown-type stuff might be worth including (have any accelerators shut down? e.g., Blueseed is suspended, basically, see https://blueseed.com/investors/ ✔ (I checked the sources, and found no closure so far, other than end of seasons)
 
** I think some closure/shutdown-type stuff might be worth including (have any accelerators shut down? e.g., Blueseed is suspended, basically, see https://blueseed.com/investors/ ✔ (I checked the sources, and found no closure so far, other than end of seasons)
* [[Timeline of Tata Group]]
+
 
  
  
Line 75: Line 75:
 
== Not ready ==
 
== Not ready ==
  
 +
* [[Timeline of Tata Group]]
 +
** Include information on [[Singur Tata Nano controversy]]
 +
** I think the 20th century part of the big picture should be broken down into the period till independence of India (1947) and the 1947 to 1991 period (1991 was the year of liberalisation). I think the 21st century can be extended to the period starting 1991
 +
** With this big picture breakdown, there should be more discussion of the impact of the Indian government and government policy on Tata. e.g., after independence, the impact of the goverrnment taking over Tata Airlines, and the high tax rates. Similarly, the impact of liberalisation and how Tata Group was one of the conglomerates in India that were able to benefit from liberalisation
 
* [[Timeline of Docomo]]
 
* [[Timeline of Docomo]]
 
* [[Timeline of Infosys]]
 
* [[Timeline of Infosys]]

Revision as of 20:21, 1 November 2019

This is Sebastián Sánchez. I am Wikisanchez in both English and Spanish Wikipedia. A diary with notes is being written in User:Sebastian/notes

Ready

Note: Read general policies related to payment for new and existing timelines [1]

New timeline

Remove from list when updated to contract work page [2] and [3].


Expansions

Requested:

Remove from list when updated to contract work page [4] and [5].

Other (not requested):

Works on Wikipedia

Requested/Accepted:


Other (not requested, not under contract, not presented for payment update):

Works on Subwiki

  Note: Shown here to ease activity monitoring outside timelineswiki. Remove after some time.
  Note: Funding for these works hasn't been discussed, therefore this list is not presented for payment update.

Devec

Priority work from Vipul

ASAP

  • Combined timeline of malaria organizations (This work is accompanied by small expansions on the timelines of the malaria organizations)
    • Maybe we can use "shorter text with expandable to see more details, with the shorter text giving a very crude summary/sentiment."

By the start of Giving Season (December 1, 2019)

By the beginning of next year (January 1, 2020)

Not ready





Pending expansion

Pending timeline

Other pending work:

To propose

Note: Vipul use ✘ for works you are not interested in (quicker than using strikes).

Subwiki projects

Subwiki purpose: "Mostly for in-depth exploration/understanding of specific topics, but still not in any sequence (so people can jump directly to a specific page)". Read this: [31]

  • Build summaries for organelles based on this model [32]
  • A table of plasmodia


Marking tools: Use ✔ ✘